Library Area Construction Updates
The construction of the new Engineering Center will significantly affect approaching Kresge Library from the south.
This diagram shows the relative locations of the library to the construction zone.
The light orange line tracing from the east side of the library, all the way down through the parking lot and then north to the Library again, signifies the fence that demarcates the construction zone,
Note that the construction zone encompasses parking spaces which had previously been available in Parking Lot P36.
The thick blue line denotes a pedestrian walkway on the perimeter of the construction zone, on the edge of the parking lot.
Parking spaces designated as Handicapped are colored light blue; the closest ones to the library are at the very western edge of the parking lot, along the sidewalk.